{
 "api_version": "1.0.0",
 "id": "US-MN-ELE-ND",
 "title": "Minnesota Request for Electrical Permit, Contractor, Non-Dwellings",
 "jurisdiction": "US-MN",
 "state": "Minnesota",
 "category": "other-forms",
 "category_label": "Other forms",
 "document_type": "official_government_form",
 "official_status": "Official form issued by Minnesota Department of Labor and Industry, Construction Codes and Licensing Division, Electrical / Permitting Unit. ALL AI FORMS is an independent fill-in service, not the issuer.",
 "issuing_agency": "Minnesota Department of Labor and Industry, Construction Codes and Licensing Division, Electrical / Permitting Unit",
 "official_source_url": "https://www.dli.mn.gov/sites/default/files/pdf/ele-non-dwelling.pdf",
 "legal_basis": null,
 "summary": "This is the Minnesota DLI Request for Electrical Permit for a contractor on a non-dwelling (REV 6.2025).",
 "price": {
  "amount": 4.99,
  "currency": "USD",
  "billing": "one-time"
 },
 "government_fee_note": "The Minnesota Department of Labor and Industry, Construction Codes and Licensing Division, Electrical / Permitting Unit filing fee (the inspection fees on the worksheet (the minimum fee for each separate inspection is $55.00), plus the required $25.00 permit fee and the required $1.00 permit surcharge, with any difference billed after inspection as the form states; a $30.00 service charge is added for a dishonored check, paid by mail with the form) is not included. You pay it yourself, directly to the State, when you file. We never collect or pay it.",
 "pay_url": "https://buy.stripe.com/3cI14g1801Xa7sb10Q0VQ3F",
 "page_url": "https://www.allaiforms.com/forms/minnesota-request-for-electrical-permit-contractor-non-dwellings/",
 "json_url": "https://www.allaiforms.com/api/forms/US-MN-ELE-ND.json",
 "free_alternative": true,
 "last_verified": null,
 "listing_updated": "2026-11-13",
 "faq": [
  {
   "q": "How do I get the Minnesota Request for Electrical Permit, Contractor, Non-Dwellings?",
   "a": "The blank Request for Electrical Permit, Contractor, Non-Dwellings is free from the Minnesota Department of Labor and Industry, Construction Codes and Licensing Division, Electrical / Permitting Unit, and you can fill it in and file it yourself directly with the agency (by mail to MN DLI, CCLD Permitting Unit, 443 Lafayette Rd. No., St. Paul, MN 55155, with a check for the grand total) without paying us. Or fill it in online here: pay $4.99 one-time with Stripe, answer the guided questions, and download your filled-in PDF."
  },
  {
   "q": "Where do I file it?",
   "a": "File the signed form yourself with the Minnesota Department of Labor and Industry, CCLD Permitting Unit, by mail at 443 Lafayette Rd. No., St. Paul, MN 55155, with a check for the grand total from the inspection-fee worksheet (inspection fees as printed, plus the required $25.00 permit fee and the required $1.00 permit surcharge). A $30.00 service charge is added for a dishonored check. We don't file or sign anything for you."
  },
  {
   "q": "How much does it cost?",
   "a": "Our fee is $4.99. The Minnesota Department of Labor and Industry, Construction Codes and Licensing Division, Electrical / Permitting Unit filing fee (the inspection fees on the worksheet (the minimum fee for each separate inspection is $55.00), plus the required $25.00 permit fee and the required $1.00 permit surcharge, with any difference billed after inspection as the form states; a $30.00 service charge is added for a dishonored check, paid by mail with the form) is not included. You pay it yourself, directly to the State, when you file. We never collect or pay it. Our $4.99 is a one-time charge with no subscription."
  },
  {
   "q": "Can I fill it out online?",
   "a": "Yes. After you pay $4.99 with Stripe, our guided questionnaire places your answers on the form and you get: The Request for Electrical Permit, Contractor, Non-Dwellings PDF, filled in from your answers. You check every entry, sign and file it yourself."
  }
 ]
}
